Otter Point Bridge Replacement

GRANT: $10,000

Williams Lake Field Naturalists / Scout Island Nature Centre to replace the decaying Otter Point Bridge with a combination steel and wood structure that will maintain the beauty of the wooden aesthetic but increase the lifespan of the bridge from 15 years (for a wooden structure) to 50 years. At the same time, the bridge and the trail leading to and from the bridge to the Otter Point boardwalk will become wheelchair accessible.

Previous
Previous

Kqa·¢kiǂ Riverside Trail

Next
Next

Mars Bridge Replacement