Back to All Events

Watersprite Lake Lower Trail Maintenance

  • Watersprite Lake Trail Canada (map)

Lead organization: BC Mountaineering Club
Event registration

BCMC Watersprite Lake Trail Work Trip

Join us for a fun day of trail work on the lower half of the Watersprite Lake Trail 20 KM East of Squamish

On this day trip we will be performing the following tasks:
1) Annual Brush clearing of the lower Watersprite Lake Trail starting at the parking area.
2) Inspection and maintenance of all lower trail structures (boardwalk, stairs and bridges).
3) Carrying in tools, and a modest amount of building supplies needed to perform maintenance and structure upgrades.
4) Construction of new stairs and boardwalk where necessary

The BCMC has an extensive set of trail building tools to equip volunteers

Required safety gear:
-Hiking Clothing
- Safety Glasses
- Work Gloves
- Ear plugs if working near chainsaws/brush cutters
-Non-BCMC Members will be required fill out a waiver

We will meet at 7:00 am at St. David's Church in West Vancouver

Previous
Previous
June 6

Opening of the Epic Trail

Next
Next
June 6

Electrify the Mountain Trails Clean Up